Skip to content
Go to platform

Last updated:

Weekly trigger

The Weekly trigger starts a dataflow automatically based on a weekly schedule.

Use the Weekly trigger when a dataflow needs to run on specific days of the week, optionally repeating every multiple weeks.

Typical use cases include:

  • Weekly data synchronization
  • Scheduled batch processing
  • Regular maintenance tasks
Setting Required Description
Start Yes The exact date and time at which the dataflow will execute once.
Recur (days) Yes Number of weeks between executions (e.g. 1 = every week, 2 = every two weeks).
Weekdays No One or more days of the week on which the dataflow should run (Monday through Sunday).
Repeat every No Enables repeated execution after the start time. The interval supports Seconds, Minutes, Hours, Days, and Weeks.
For duration of No Defines how long the repeated executions should continue. Can be set to Indefinitely or a specific duration in Seconds, Minutes, Hours, Days, or Weeks.
Random delay No Adds a random delay before execution. The delay value supports Seconds, Minutes, Hours, Days, and Weeks.
  • Select at least one weekday to ensure the trigger executes.
  • Use recur (days) = 1 for standard weekly schedules.
  • Limit repeat every unless multiple executions per day are required.
  • Check the configured timezone before enabling the flow.